Prairie Side Ace Hardware

  • 20200622 161238
  • 20200622 161515
  • 20200626 065547
  • 20200626 065550
  • 20200715 164047
  • 20200716 162628
  • 20200722 164605
  • 20200722 171025
  • 20200824 092413
  • 20200902 161120
  • 20200902 161442
  • 20200908 160113
  • 20200908 160216
  • 20201006 085305
  • 20201012 162354
  • 20201015 144104
  • Img 2775
  • 20201028 163505
  • 20201028 163613
  • 20210511 065414
  • Banenelson 10 17 21 1
  • Banenelson 10 17 21 6
  • Banenelson 10 17 21 7
  • Banenelson 10 17 21 9
  • Banenelson 10 17 21 13

Project Details

Project Type: New_Construction
Project Location: Kenosha, WI

Project Description

Bane-Nelson, Inc. was selected as Design/Build Contractor for the construction of a ~20,000 sqft hardware store and associated site improvements. Teaming with Partners in Design Architects, a Butler PEMB structure was designed and constructed to meet the needs of the client, as well as be aesthetically pleasing and a great fit for the area’s architecture. The Butler structure allowed for wide open interior spaces and an engineered and efficient building envelope. Many considerations were taken with regard to site layout and storm water run-off and retention and creative solutions were implemented to meet local and state requirements for the best possible price point.